• 2 × 10’ YP Floor Joist
  • Double 2 × 10” Girders Pre Plan
  • ¾” Tongue-And-Groove Sub-Flooring Nailed and Glued To Floor Joist To Reduce Squeaks
  • Luan Underlayment Under All Soft Tile Areas
  • 2 × 10 Header Materials On All Load Bearing Walls
  • Treated Sill Plate
  • Perlin Blocking All Spans Of Ten Feet
  • Floor System Anchored To Foundation